| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8362518 | Name of Scheme: GUANA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 5496 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 15-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | tubewell | 29/131 | guana | 28.836634 | 77.382413 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible pump | 1000/71 | guana | 28.836634 | 77.382413 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350/14 | guana | 28.836615 | 77.382434 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K7 | 150 | 0.050 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.5375 | |
| 2 | HDPE | 75 | 2.021 | |
| 3 | HDPE | 63 | 3.5725 | |
| 4 | HDPE | 200 | 0.2161 | |
| 5 | HDPE | 160 | 0.068 | |
| 6 | HDPE | 140 | 0.1768 | |
| 7 | HDPE | 110 | 0.1655 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 718 |