| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8362576 | Name of Scheme: GWALI KHERA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2269 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 06-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 21 MTR /105.40 MTR | GWALI KHERA | 29.016516 | 77.343484 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 15 HP | GWALI KHERA | 29.016516 | 77.343484 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL - 12 MTR | GWALI KHERA | 29.01662 | 77.343585 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K7- D.I PIPE | 100 | 0.0352 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 4.097 | |
| 2 | HDPE PIPE | 75 | 0.460 | |
| 3 | HDPE PIPE | 90 | 0.226 | |
| 4 | HDPE PIPE | 110 | 0.064 | |
| 5 | HDPE PIPE | 125 | 0.1975 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 461 |