Project Completion Certificate (Ground Water)
Scheme ID: 8362646 Name of Scheme: MAU No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3335 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 03-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24.06 Mtr / 167.38 Mtr MAU 26.8524321 79.5000906
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 44.7(M3/Hr.)/46 Mtr. MAU 26.8524321 79.5000906
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/16 MAU 26.8509468 79.4948187
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 5.45
2 DI 150 16.85
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7225.60
2 HDPE 75 103
3 HDPE 90 693.20
4 HDPE 110 514
5 HDPE 140 170
6 HDPE 160 299
HSC Connection
Sno. Total Nos.
1 620
Other Details
2.11
2.12
2.12
04-Nov-2023
05-Nov-2023