Project Completion Certificate (Ground Water)
Scheme ID: 8362752 Name of Scheme: SAMASPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2450 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 12-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 29.99 M / 99.17 M Samaspur 29°08'10.2"N 77°46'45.2"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 500 LPM / 54 M Samaspur 29°08'10.2"N 77°46'45.2"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 Kl / 16 M Samaspur 29°08'10.2"N 77°46'45.2"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.007
2 HDPE 90 0.366
HSC Connection
Sno. Total Nos.
1 507
Other Details
2.30
2.30
1.80
21-Apr-2023
25-Oct-2024