Project Completion Certificate (Ground Water)
Scheme ID: 8362763 Name of Scheme: SET KUAN No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1734 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 05-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Wells 27.31 Mtr /94.65 Mtr SETKUA 28.814529 77.738523
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 400 LPM/ 50 Mtr SETKUA 28.814529 77.738523
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KI / 12 M SETKUA 28.814529 77.738523
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.5
2 HDPE 90 0.2
HSC Connection
Sno. Total Nos.
1 330
Other Details
2.09
2.09
1.66
24-May-2023
17-Dec-2024