Project Completion Certificate (Ground Water)
Scheme ID: 8362768 Name of Scheme: BARHANPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2192 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 27-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 28.41 M / 93.94 M Barhanpur 28°49'07.4 77°43'59.6"
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 450 LPM / 54 M Barhanpur 28°49'07.4 77°43'59.6"
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 Kl / 16 M Barhanpur 28°49'07.4 77°43'59.6"
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.02340
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.207
2 HDPE 90 0.350
3 HDPE 110 0.255
4 HDPE 125 0.228
5 HDPE 140 0.319
6 HDPE 160 1031.20
HSC Connection
Sno. Total Nos.
1 320
Other Details
2.61
0.00
2.00
20-Mar-2023
07-Oct-2024