Project Completion Certificate (Ground Water)
Scheme ID: 8362811 Name of Scheme: BHANDAURA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3172 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 21-Aug-2024 Actual Date of Completion (Capex): 05-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 39.03 Mtr/95.8Mtr Bahandaura 29.4475888 77.42343532
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 700 LPM / 66Mtr Bahandaura 29.5094880 77.454299
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KI / 12M Bahandaura 29.5094880 77.454299
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.l. 150 0.0015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.784
2 HDPE 75 0.509
3 HDPE 90 0.959
4 HDPE 110 0.187
5 HDPE 160 0.157
6 HDPE 200 0.071
HSC Connection
Sno. Total Nos.
1 775
Other Details
2.24
0.00
2.17
04-Jan-2026
05-Jan-2026