Project Completion Certificate (Ground Water)
Scheme ID: 8362825 Name of Scheme: AUNDERI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3260 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Sep-2021 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 36/188.31 Aunderi 26.344105 79.761412
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 27.17/64 Aunderi 26.344105 79.761412
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/12 Aunderi 26.344105 79.761412
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.013 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.808 As per Site
2 HDPE 75 1.270 As per Site
3 HDPE 90 1.324 As per Site
4 HDPE 110 0.565 As per Site
5 HDPE 160 0.301 As per Site
6 HDPE 180 0.642 As per Site
HSC Connection
Sno. Total Nos.
Other Details
2.85
2.54
2.54
30-Sep-2023
01-Oct-2023