| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8362825 | Name of Scheme: AUNDERI | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3260 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 15-Sep-2021 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 36/188.31 | Aunderi | 26.344105 | 79.761412 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 27.17/64 | Aunderi | 26.344105 | 79.761412 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225/12 | Aunderi | 26.344105 | 79.761412 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.013 | As per Site |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.808 | As per Site |
| 2 | HDPE | 75 | 1.270 | As per Site |
| 3 | HDPE | 90 | 1.324 | As per Site |
| 4 | HDPE | 110 | 0.565 | As per Site |
| 5 | HDPE | 160 | 0.301 | As per Site |
| 6 | HDPE | 180 | 0.642 | As per Site |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |