Project Completion Certificate (Ground Water)
Scheme ID: 8362865 Name of Scheme: MAHROLI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3061 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 19-Dec-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.15 Mtr / 90.39 Mtr SADULPUR URF CHANDRAPURA 28.849673 77.705704
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 650 LPM / 52 Mtr SADULPUR URF CHANDRAPURA 28.849673 77.705704
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl / 14 M SADULPUR URF CHANDRAPURA 28.849673 77.705704
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.01650
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.748
2 HDPE 90 0.509
3 HDPE 110 0.082
4 HDPE 125 0.162
5 HDPE 140 0.357
6 HDPE 180 1.239
HSC Connection
Sno. Total Nos.
1 514
Other Details
3.24
3.24
2.59
08-May-2023
26-Dec-2024