Project Completion Certificate (Ground Water)
Scheme ID: 8362907 Name of Scheme: MAHULIA WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 2492 Base Year: 2022 Intermediate Year: 2052 Design Year: 2052
Date of Completion (As per Contract): 27-Feb-2023 Actual Date of Completion (Capex): 11-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
HSC Connection
Sno. Total Nos.
Other Details
2.36
0.00
2.30
11-May-2024
19-Nov-2024