Project Completion Certificate (Ground Water)
Scheme ID: 8362914 Name of Scheme: CHOULHADA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2122 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/97 CHOULHADA 28.938815 77.286992
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 500/68 CHOULHADA 28.938815 77.286992
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 CHOULHADA 28.938862 77286914
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0010
2 DI 150 0.0077
3 DI 200 0.0120
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.594
2 HDPE 75 0.359
3 HDPE 63 3.756
4 HDPE 160 0.235
5 HDPE 140 0.0624
6 HDPE 110 0.194
HSC Connection
Sno. Total Nos.
1 570
Other Details
1.75
1.75
1.78
31-Aug-2024
01-Sep-2024