Project Completion Certificate (Ground Water)
Scheme ID: 8362948 Name of Scheme: KOLUHA GRAM PANCHAYAT RURAL DRINKING WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5670 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Jun-2025 Actual Date of Completion (Capex): 15-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.5/194.5 KOLUHA 27.487468 81.715812
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 45/35 KOLUHA 27.487468 81.715812
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/12 KOLUHA 27.487562 81.715803
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Rising Main/DI-K7 150 0.048
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 6.780
2 HDPE Pipe PN-6; Class PE-100 75 0.721
3 HDPE Pipe PN-6; Class PE-100 90 0.285
4 HDPE Pipe PN-6; Class PE-100 110 0.724
5 HDPE Pipe PN-6; Class PE-100 125 0.041
6 HDPE Pipe PN-6; Class PE-100 140 0.139
7 HDPE Pipe PN-6; Class PE-100 160 0.075
8 HDPE Pipe PN-6; Class PE-100 180 0.160
HSC Connection
Sno. Total Nos.
1 550
Other Details
2.37
2.28
2.28
14-Feb-2024