Project Completion Certificate (Ground Water)
Scheme ID: 8362955 Name of Scheme: TARAPUR No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 4006 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 17-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36.97 Mtr / 96.63 Mtr TARAPUR 29.224756 78.045727
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 900 LPM / 56 Mtr TARAPUR 29.224756 78.045727
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 Kl / 18 M TARAPUR 29.224756 78.045727
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.02250
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.200
2 HDPE 90 0.621
3 HDPE 110 0.831
4 HDPE 125 0.226
5 HDPE 140 0.225
6 HDPE 160 0.107
7 HDPE 180 0.643
HSC Connection
Sno. Total Nos.
1 604
Other Details
4.09
4.09
3.24
03-Dec-2023
11-Apr-2025