Project Completion Certificate (Ground Water)
Scheme ID: 8362973 Name of Scheme: KATIYA No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2556 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 07-Jan-2023 Actual Date of Completion (Capex): 23-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.91/115.75 Katiya 27.508588 80.638872
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 600 LPM/ 50 Mtr. Katiya 27.508588 80.638872
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 20 Mtr. Katiya 27.508588 80.638872
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 5.673
2 HDPE Pipe 90 1.111
3 HDPE Pipe 110 1.727
4 HDPE Pipe 140 0.251
5 HDPE Pipe 200 1.544
HSC Connection
Sno. Total Nos.
1 497
Other Details
2.32
2.63
2.63
22-Dec-2023
23-Nov-2024