| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8368514 | Name of Scheme: Khangauda W/S Scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3203 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 20-Mar-2023 | Actual Date of Completion (Capex): 07-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 27.08M/96.73M | KHANGAUDA | 28.5902755 | 77.6303906 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBBLE | 700LPM/53M | KHANGAUDA | 28.5902755 | 77.6303906 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175KL/12MTR | KHANGAUDA | 28.5902755 | 77.6303906 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.014 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.450 | |
| 2 | HDPE | 75 | 2.204 | |
| 3 | HDPE | 90 | 0.314 | |
| 4 | HDPE | 110 | 0.265 | |
| 5 | HDPE | 140 | 0.444 | |
| 6 | HDPE | 160 | 0.015 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 681 |