Project Completion Certificate (Ground Water)
Scheme ID: 8386584 Name of Scheme: Keeratpur Dheera No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1980 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 28-Feb-2023 Actual Date of Completion (Capex): 22-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.165
2 HDPE 75 0.254
3 HDPE 90 0.209
4 HDPE 110 0.035
HSC Connection
Sno. Total Nos.
1 198
Other Details
158.50
154.29
154.29
22-Feb-2024
25-Oct-2024