Project Completion Certificate (Ground Water)
Scheme ID: 8386588 Name of Scheme: Bajaha No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2890 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 04-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 35.62/79.73 Bajaha 26.893668 83.470192
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 39/39 Bajaha 26.893668 83.470192
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 150/12 Bajaha 26.893649 83.470118
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.035 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.702 Completed
2 HDPE 75 3.694 Completed
3 HDPE 90 0.710 Completed
4 HDPE 110 0.424 Completed
5 HDPE 140 0.538 Completed
6 HDPE 200 0.400 Completed
HSC Connection
Sno. Total Nos.
1 468
Other Details
2.35
0.00
2.24
04-Jul-2025
19-Apr-2025