Project Completion Certificate (Ground Water)
Scheme ID: 8386590 Name of Scheme: Jamunia No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2760 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 26-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/102.82 Jamunia 26.8410 83.4700
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 39/40 Jamunia 26.8410 83.4700
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 200/12 Jamunia 26.8410 83.4700
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.009 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.639 Laying Completed
2 HDPE 75 0.469 Laying Completed
3 HDPE 90 0.076 Laying Completed
4 HDPE 140 0.328 Laying Completed
5 HDPE 160 0.144 Laying Completed
6 HDPE 200 0.833 Laying Completed
HSC Connection
Sno. Total Nos.
1 423
Other Details
2.79
0.00
2.45
25-Dec-2024
01-Apr-2025