Project Completion Certificate (Ground Water)
Scheme ID: 8386608 Name of Scheme: DADHAULI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1608 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Mar-2024 Actual Date of Completion (Capex): 25-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200mmX150mm 27.02m/138.29m Dadhauli 25.364558 83.301902
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Borewell Pump 20.68(CUM)/55(mtr.) Dadhauli 25.364558 83.301902
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVERHEAD TANK 100KL/12M Dadhauli 25.364586 83.30188
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 80 0.076
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.52
2 HDPE 75 1.4
3 HDPE 90 0.38
4 HDPE 110 0.805
5 HDPE 140 0.36
6 K-7 200 0.047
7 K-7 250 0.025
HSC Connection
Sno. Total Nos.
1 272
Other Details
2.03
2.03
0.00
24-Feb-2025
30-Aug-2025