| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8386609 | Name of Scheme: Bhaunrabari | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 4290 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-May-2023 | Actual Date of Completion (Capex): 18-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 27.16/137.42 | Bhaunrabari | 27.023931 | 83.350894 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 54/41 | Bhaunrabari | 27.023931 | 83.350894 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank | 225/14 | Bhaunrabari | 27.023866 | 83.350612 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.035 | Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.040 | Completed |
| 2 | HDPE | 75 | 4.789 | Completed |
| 3 | HDPE | 90 | 1.689 | Completed |
| 4 | HDPE | 110 | 0.720 | Completed |
| 5 | HDPE | 140 | 0.325 | Completed |
| 6 | HDPE | 160 | 0.276 | Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 635 |