Project Completion Certificate (Ground Water)
Scheme ID: 8386614 Name of Scheme: Bankati Urf Itahia Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1870 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 04-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.01/129.69 Bakatia Urf Itahiya 26.8293 83.4487
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 27/40 Bakatia Urf Itahiya 26.8293 83.4487
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 150/12 Bakatia Urf Itahiya 26.8293 83.4487
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.005 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.948 Completed
2 HDPE 75 0.946 Completed
3 HDPE 110 0.380 Completed
4 HDPE 140 0.187 Completed
HSC Connection
Sno. Total Nos.
1 346
Other Details
1.94
0.00
2.05
03-Jun-2023
01-Apr-2025