Scheme ID: 8386616 Name of Scheme: FARASND No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5996 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Apr-2025 Actual Date of Completion (Capex): 20-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300mmX1500mm 26.96m/151.01m Farsand Mohanpur 25.309537 83.234488
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Borewell Pump 72.29(CUM)/63(mtr) Farsand Mohanpur 25.309537 83.234488
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVERHEAD TANK 400(KL)/20(M) Farsand Mohanpur 25.309514 83.234448
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 150 0.084
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.373
2 HDPE 75 0.343
3 HDPE 90 6.03
4 HDPE 110 0.089
5 HDPE 140 1.386
6 HDPE 160 0.159
7 DI-K7 200 0.134
8 DI-K7 250 0.021
HSC Connection
Sno. Total Nos.
1 967
Other Details
3.62
3.62
0.00
27-Feb-2025
30-Jun-2025