| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8386634 | Name of Scheme: BARCHCHA | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3996 | Base Year: 2023 | Intermediate Year: 2039 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 x 150 mm | 138.06/30 | Barchchha | 25.227636 | 83.103041 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Borewell Pump | 39(Cum)/59m | Barchchha | 25.227636 | 83.103041 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVERHEAD TANK | 250/16 | Barchchha | 25.22591 | 83.101547 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 28 | From T.W to ESR |
| 2 | DI | 200 | 65 | From T.W to ESR |
| 3 | HDPE | 90 | 5 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 12.76 | |
| 2 | HDPE | 75 | 1.222 | |
| 3 | HDPE | 90 | 0.51 | |
| 4 | HDPE | 110 | 2.68 | |
| 5 | HDPE | 140 | 0.37 | |
| 6 | HDPE | 160 | 1.74 | |
| 7 | DI | 100 | 80 | |
| 8 | DI | 200 | 40 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 708 |