Project Completion Certificate (Ground Water)
Scheme ID: 8386636 Name of Scheme: POCHHIYA BRAHM ASTHAN Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 3370 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 06-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.13/138.74 Pochhiya Brahm Asthan 26.6419 83.4551
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 48/41 Pochhiya Brahm Asthan 26.6419 83.4551
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank- 150/14 Pochhiya Brahm Asthan 26.6425 83.4558
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.028 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.039 Completed
2 HDPE 75 0.337 Completed
3 HDPE 90 0.489 Completed
4 HDPE 110 0.820 Completed
5 HDPE 140 1.172 Completed
HSC Connection
Sno. Total Nos.
Other Details
2.30
0.00
2.42
05-Jan-2023
01-Apr-2025