Project Completion Certificate (Ground Water)
Scheme ID: 8386649 Name of Scheme: AKOLHEE G.P. WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3300 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 03-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.26/113.59 Akolhee 26.657411 83.451839
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 42/41 Akolhee 26.657411 83.451839
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 200/14 Akolhee 26.657402 83.451828
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.018 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.650 Completed
2 HDPE 75 0.647 Completed
3 HDPE 90 0.590 Completed
4 HDPE 140 0.131 Completed
HSC Connection
Sno. Total Nos.
1 447
Other Details
2.16
0.00
2.30
02-Jun-2023
01-Apr-2025