| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8386673 | Name of Scheme: DEIPAR WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3360 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-Feb-2023 | Actual Date of Completion (Capex): 01-Jun-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.05/99.8 | Deipar | 26.7276 | 83.2643 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 45/41 | Deipar | 26.7276 | 83.2643 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Overhead Tank-1 | 150/14 | Deipar | 26.7276 | 83.2643 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.017 | Laying Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.62 | Laying Completed |
| 2 | HDPE | 75 | 0.162 | Laying Completed |
| 3 | HDPE | 90 | 0.118 | Laying Completed |
| 4 | HDPE | 110 | 0.998 | Laying Completed |
| 5 | HDPE | 140 | .173 | Laying Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 571 |