Project Completion Certificate (Ground Water)
Scheme ID: 8386673 Name of Scheme: DEIPAR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3360 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Feb-2023 Actual Date of Completion (Capex): 01-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.05/99.8 Deipar 26.7276 83.2643
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 45/41 Deipar 26.7276 83.2643
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/14 Deipar 26.7276 83.2643
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.017 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.62 Laying Completed
2 HDPE 75 0.162 Laying Completed
3 HDPE 90 0.118 Laying Completed
4 HDPE 110 0.998 Laying Completed
5 HDPE 140 .173 Laying Completed
HSC Connection
Sno. Total Nos.
1 571
Other Details
2.29
0.00
2.29
28-Jul-2025
01-Jun-2026