Project Completion Certificate (Ground Water)
Scheme ID: 8386679 Name of Scheme: Chhapra Mansoor Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1810 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2023 Actual Date of Completion (Capex): 06-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.6/116.76 Chhapra Mansoor 26.7256 83.5761
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 27/40 Chhapra Mansoor 26.7256 83.5761
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 100/12 Chhapra Mansoor 26.7258 83.5760
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.050 Laying Completed
2 HDPE 75 1.677 Laying Completed
3 HDPE 90 0.402 Laying Completed
4 HDPE 110 0.080 Laying Completed
5 HDPE 140 0.188 Laying Completed
6 HDPE 160 0.039 Laying Completed
HSC Connection
Sno. Total Nos.
1 322
Other Details
1.74
0.00
1.74
05-Jun-2023
22-Nov-2024