Project Completion Certificate (Ground Water)
Scheme ID: 8388418 Name of Scheme: LILWAL No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 4640 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 29-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 22.98 Mtr/ 121.88 Mtr LILWAL 27.48348 80.213201
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.1 M³ per Min /45 Mtr LILWAL 27.48348 80.213201
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL/ 20 Mtr LILWAL 27.483702 80.213426
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02786
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.096
2 HDPE Pipe PN-6, Class PE-100 75 3.773
3 HDPE Pipe PN-6, Class PE-100 90 2.407
4 HDPE Pipe PN-6, Class PE-100 110 0.663
5 HDPE Pipe PN-6, Class PE-100 125 0.686
6 HDPE Pipe PN-6, Class PE-100 160 1.559
7 HDPE Pipe PN-6, Class PE-100 200 0.157
HSC Connection
Sno. Total Nos.
1 584
Other Details
4.70
0.00
3.25
28-May-2024
25-Dec-2024