Project Completion Certificate (Ground Water)
Scheme ID: 8388423 Name of Scheme: SHIVRI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1930 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 20-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 21Mtr/ 106.95Mtr SHIVRI 27.48995 80.203548
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.5 M³ per Min /45Mtr SHIVRI 27.48995 80.203548
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/ 16Mtr SHIVRI 27.489933 80.203485
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02238
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 1.592
2 HDPE Pipe PN-6, Class PE-100 75 1.240
3 HDPE Pipe PN-6, Class PE-100 110 0.304
4 HDPE Pipe PN-6, Class PE-100 125 0.961
HSC Connection
Sno. Total Nos.
1 296
Other Details
2.04
0.00
1.76
19-Jul-2023
25-Dec-2024