Project Completion Certificate (Ground Water)
Scheme ID: 8388438 Name of Scheme: KATARI PARSOLA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4706 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 01-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 16 M/ 65.8 M KATARI PARSOLA 27.083853 80.00825
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.100 M³ per Min /45Mtr KATARI PARSOLA 27.083853 80.00825
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL/ 20 Mtr KATARI PARSOLA 27.08393 80.008312
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02264
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 5.6289
2 HDPE Pipe PN-6, Class PE-100 75 3.3647
3 HDPE Pipe PN-6, Class PE-100 90 0.7111
4 HDPE Pipe PN-6, Class PE-100 110 1.0628
5 HDPE Pipe PN-6, Class PE-100 125 1.2759
6 HDPE Pipe PN-6, Class PE-100 140 2.1784
7 HDPE Pipe PN-6, Class PE-100 160 0.8307
8 HDPE Pipe PN-6, Class PE-100 200 0.1611
HSC Connection
Sno. Total Nos.
1 775
Other Details
3.40
0.00
3.32
30-Jun-2023
24-Dec-2024