Project Completion Certificate (Ground Water)
Scheme ID: 8388449 Name of Scheme: SARIPUR CHHACHHETA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3845 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 03-Jan-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18 Mtr/ 129.21 Mtr SARIPUR CHHACHHETA 27.404566 80.306735
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.65 M³ per Min /45Mtr SARIPUR CHHACHHETA 27.404566 80.306735
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/ 14Mtr SARIPUR CHHACHHETA 27.404566 80.306735
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.0209
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, CLass PE-100 63 1.057
2 HDPE Pipe PN-6, CLass PE-100 75 1.003
3 HDPE Pipe PN-6, CLass PE-100 90 0.612
4 HDPE Pipe PN-6, CLass PE-100 110 0.629
5 HDPE Pipe PN-6, CLass PE-100 125 0.154
6 HDPE Pipe PN-6, CLass PE-100 140 0.479
7 HDPE Pipe PN-6, CLass PE-100 160 0.019
HSC Connection
Sno. Total Nos.
1 287
Other Details
2.17
0.00
1.98
02-Apr-2023
24-Dec-2024