Scheme ID: 8388488 Name of Scheme: Emiliya Urf Bijhara Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2330 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Feb-2023 Actual Date of Completion (Capex): 09-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.06,106.94 Emilya Urf Bijhra 26.7616 83.4938
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 33,39 Emilya Urf Bijhra 26.7616 83.4938
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/12 Emilya Urf Bijhra 26.7616 83.4938
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Pipe Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.464 Pipe Laying Completed
2 HDPE 75 2.175 Pipe Laying Completed
3 HDPE 90 1.802 Pipe Laying Completed
4 HDPE 125 0.200 Pipe Laying Completed
5 HDPE 160 0.327 Pipe Laying Completed
HSC Connection
Sno. Total Nos.
1 398
Other Details
2.17
0.00
2.23
08-Sep-2024
09-Dec-2024