Project Completion Certificate (Ground Water)
Scheme ID: 8388491 Name of Scheme: Basdila Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2240 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Feb-2023 Actual Date of Completion (Capex): 10-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 17.08/125.81 Basdila 26.7067 83.5774
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 30/40 Basdila 26.7067 83.5774
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/12 Basdila 26.7067 83.5774
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.749 Laying Completed
2 HDPE 75 2.507 Laying Completed
3 HDPE 90 0.328 Laying Completed
4 HDPE 110 0.557 Laying Completed
5 HDPE 140 0.223 Laying Completed
HSC Connection
Sno. Total Nos.
1 410
Other Details
1.96
0.00
1.99
09-May-2024
11-Dec-2024