Project Completion Certificate (Ground Water)
Scheme ID: 8388562 Name of Scheme: GOSARPUR W/S SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2157 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-May-2026 Actual Date of Completion (Capex): 20-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBWELL 15/51.05 GOSARPUR 27.295022 79.500981
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSABLE PUMP 350/49 GOSARPUR 27.295022 79.500981
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/12 GOSARPUR 27.295022 79.500981
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K9 80 0.0211
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.061
2 HDPE 63 8.262
3 HDPE 75 0.176
4 HDPE 110 0.660
5 HDPE 140 0.163
6 HDPE 160 0.115
HSC Connection
Sno. Total Nos.
1 476
Other Details
2.59
2.45
2.59
20-Jul-2026
21-Jul-2026