Project Completion Certificate (Ground Water)
Scheme ID: 8388591 Name of Scheme: BALEHRA No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2690 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 18-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24 Mtr/ 123.30 Mtr BALEHRA 27.46034 80.028167
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.6 M³ per Min /45 Mtr BALEHRA 27.46034 80.028167
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 20 Mtr BALEHRA 27.460236 80.028193
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.01762
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 2.099
2 HDPE Pipe PN-6, Class PE-100 75 1.407
3 HDPE Pipe PN-6, Class PE-100 90 0.908
4 HDPE Pipe PN-6, Class PE-100 125 0.235
5 HDPE Pipe PN-6, Class PE-100 160 2.157
HSC Connection
Sno. Total Nos.
1 333
Other Details
2.71
0.00
2.09
17-Jan-2024
24-Dec-2024