Project Completion Certificate (Ground Water)
Scheme ID: 8388596 Name of Scheme: NIVUAI No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2360 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 20-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.12 Mtr/ 118.32 Mtr NIVUAI 27.431804 80.28217
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.6 M³ per Min /45Mtr NIVUAI 27.431804 80.28217
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 16 Mtr NIVUAI 27.431707 80.282162
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 150 0.02946
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 1.503
2 HDPE Pipe PN-6, Class PE-100 75 1.215
3 HDPE Pipe PN-6, Class PE-100 90 1.720
4 HDPE Pipe PN-6, Class PE-100 110 0.430
5 HDPE Pipe PN-6, Class PE-100 140 0.348
HSC Connection
Sno. Total Nos.
1 332
Other Details
2.50
0.00
2.16
19-Aug-2023
25-Dec-2024