Project Completion Certificate (Ground Water)
Scheme ID: 8388633 Name of Scheme: Bhandauli No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1920 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 31-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.02 / 90.1 BHANDAULI 28.4842002 77.8766563
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 400 / 47 BHANDAULI 28.4842002 77.8766563
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100 KL / 12 M BHANDAULI 28.29035 77.52356
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0239
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.918
2 HDPE 75 0.319
3 HDPE 90 0.064
4 HDPE 140 0.672
HSC Connection
Sno. Total Nos.
1 406
Other Details
1.71
1.61
1.58
30-Jun-2025
01-Jul-2025