| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8388645 | Name of Scheme: Adauli | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 6942 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 16-Feb-2023 | Actual Date of Completion (Capex): 08-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 30 M / 118.30 M | ADAULI | 28.416056 | 77.7939524 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE | 1500 LPM / 48.60 M | ADAULI | 28.416056 | 77.7939524 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 400 KL / 14 M | ADAULI | 28.415821 | 77.930769 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 200 | 0.0324 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 11.11 | |
| 2 | HDPE | 75 | 0.615 | |
| 3 | HDPE | 90 | 0.686 | |
| 4 | HDPE | 110 | 0.437 | |
| 5 | HDPE | 140 | 0.355 | |
| 6 | HDPE | 160 | 0.640 | |
| 7 | HDPE | 200 | 1.03 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1302 |