Project Completion Certificate (Ground Water)
Scheme ID: 8388645 Name of Scheme: Adauli No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 6942 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Feb-2023 Actual Date of Completion (Capex): 08-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30 M / 118.30 M ADAULI 28.416056 77.7939524
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE 1500 LPM / 48.60 M ADAULI 28.416056 77.7939524
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 400 KL / 14 M ADAULI 28.415821 77.930769
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0324
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.11
2 HDPE 75 0.615
3 HDPE 90 0.686
4 HDPE 110 0.437
5 HDPE 140 0.355
6 HDPE 160 0.640
7 HDPE 200 1.03
HSC Connection
Sno. Total Nos.
1 1302
Other Details
3.63
3.53
3.66
10-Apr-2025
11-Apr-2025