| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8388648 | Name of Scheme: HUSENPUR KAVRA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2590 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Jul-2023 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 17.94/76..93 | HUSENPUR KAVRA | 28.027889 | 79.714239 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT - PUMP 1 | 30/43 | HUSENPUR KAVRA | 28.027889 | 79.714239 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 150/12 | HUSENPUR KAVRA | 28.028022 | 79.714044 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 100 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 4.410 | |
| 2 | HDPE / 6KG | 75 | 0.065 | |
| 3 | HDPE / 6KG | 90 | 0.515 | |
| 4 | HDPE / 6KG | 140 | 0.386 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 408 |