Project Completion Certificate (Ground Water)
Scheme ID: 8388648 Name of Scheme: HUSENPUR KAVRA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2590 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Jul-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 17.94/76..93 HUSENPUR KAVRA 28.027889 79.714239
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT - PUMP 1 30/43 HUSENPUR KAVRA 28.027889 79.714239
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150/12 HUSENPUR KAVRA 28.028022 79.714044
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 4.410
2 HDPE / 6KG 75 0.065
3 HDPE / 6KG 90 0.515
4 HDPE / 6KG 140 0.386
HSC Connection
Sno. Total Nos.
1 408
Other Details
1.97
0.00
1.97
30-Oct-2023
06-Dec-2024