Project Completion Certificate (Ground Water)
Scheme ID: 8388783 Name of Scheme: KAKRALA VILLAGE WATER SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2269 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2023 Actual Date of Completion (Capex): 12-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15.00Mt / 185.00 Mtr KAKARALA 29.089623 78.288285
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 7.50 HP 450 LPM / 40 Mtr KAKARALA 29.089623 78.288285
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL /12.00 mtr KAKRALA 29.089488 78.288335
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI Pipe 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class 140 0.160
2 HDPE Pipe PN-6 Class 110 0.315
3 HDPE Pipe PN-6 Class 90 0.167
4 HDPE Pipe PN-6 Class 75 0.190
5 HDPE Pipe PN-6 Class 63 4.917
HSC Connection
Sno. Total Nos.
1 404
Other Details
1.85
1.85
1.85
10-Jun-2024
11-Jun-2024