| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8388790 | Name of Scheme: Shekhpuri Chaohad | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2350 | Base Year: 2022 | Intermediate Year: 2032 | Design Year: 2052 |
| Date of Completion (As per Contract): 29-Sep-2023 | Actual Date of Completion (Capex): 11-Dec-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 78.42 Mt / 101.25 Mtr | Shekhpuri Chaohad | 29.102683 | 78.164806 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump 10.0 HP | 600 LPM / 40 Mtr | Shekhpuri Chaohad | 29.102683 | 78.164806 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL /12.00 mtr | Shekhpuri Chaohad | 29.102774 | 74.164681 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 DI Pipe | 100 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6 Class | 125 | 0.078 | |
| 2 | HDPE Pipe PN-6 Class | 110 | 0.484 | |
| 3 | HDPE Pipe PN-6 Class | 90 | 0.265 | |
| 4 | HDPE Pipe PN-6 Class | 75 | 0.298 | |
| 5 | HDPE Pipe PN-6 Class | 63 | 6.121 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 405 |