| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8388812 | Name of Scheme: SULTANPUR KHADAR VILLAGE WATER SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2237 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 30-Sep-2024 | Actual Date of Completion (Capex): 12-Dec-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL WORK | 68.51 MTR / 101.25 MTR | SULTANPUR KHADER | 29.160669 | 78.154053 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP 10.00 HP | 600 LPM / 40 MTR | SULTANPUR KHADER | 29.160669 | 78.154053 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 12 MTR | SULTANPUR KHADER | 29.130418 | 78.153895 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE K-7 | 100 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 CLASS PE-100 | 160 | 0.176 | |
| 2 | HDPE PIPE PN-6 CLASS PE-100 | 140 | 0.355 | |
| 3 | HDPE PIPE PN-6 CLASS PE-100 | 125 | 0.163 | |
| 4 | HDPE PIPE PN-6 CLASS PE-100 | 110 | 0.357 | |
| 5 | HDPE PIPE PN-6 CLASS PE-100 | 90 | 0.853 | |
| 6 | HDPE PIPE PN-6 CLASS PE-100 | 75 | 0.482 | |
| 7 | HDPE PIPE PN-6 CLASS PE-100 | 63 | 4.256 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 406 |