Project Completion Certificate (Ground Water)
Scheme ID: 8388812 Name of Scheme: SULTANPUR KHADAR VILLAGE WATER SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2237 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 30-Sep-2024 Actual Date of Completion (Capex): 12-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL WORK 68.51 MTR / 101.25 MTR SULTANPUR KHADER 29.160669 78.154053
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 10.00 HP 600 LPM / 40 MTR SULTANPUR KHADER 29.160669 78.154053
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 12 MTR SULTANPUR KHADER 29.130418 78.153895
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE K-7 100 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 160 0.176
2 HDPE PIPE PN-6 CLASS PE-100 140 0.355
3 HDPE PIPE PN-6 CLASS PE-100 125 0.163
4 HDPE PIPE PN-6 CLASS PE-100 110 0.357
5 HDPE PIPE PN-6 CLASS PE-100 90 0.853
6 HDPE PIPE PN-6 CLASS PE-100 75 0.482
7 HDPE PIPE PN-6 CLASS PE-100 63 4.256
HSC Connection
Sno. Total Nos.
1 406
Other Details
1.97
1.97
1.97
10-Jun-2024
11-Jun-2024