| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8388820 | Name of Scheme: BARAMJITPUR CHANDA GRAMPANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2478 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 29-Sep-2021 | Actual Date of Completion (Capex): 10-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 30.26/120.87 | baramjeetpur chanda | 29.47222 | 78.29598 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible pump | 550/45 | baramjeet chanda | 29.47222 | 78.29598 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL/12 MTR | BARAMJEET PUR CHANDA | 29.472109 | 78.293052 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI -K7 | 150 | 0.050 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 180 | 0.032 | |
| 2 | HDPE PIPE | 160 | 0.738 | |
| 3 | HDPE PIPE | 140 | 0.034 | |
| 4 | HDPE PIPE | 110 | 1.575 | |
| 5 | HDPE PIPE | 75 | 0.247 | |
| 6 | HDPE PIPE | 63 | 4.144 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 618 |