Project Completion Certificate (Ground Water)
Scheme ID: 8389102 Name of Scheme: RIYAV No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 3472 Base Year: 2022 Intermediate Year: 2036 Design Year: 2052
Date of Completion (As per Contract): 20-Sep-2023 Actual Date of Completion (Capex): 25-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Depth of Strainer (m) 24 TW 26.208383 83.457503
2 Depth of Plain Pipe (m) 94 TW 26.208383 83.457503
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 700/45 TW 26.208383 83.457503
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Tank 150/14 OHT 26.208385 83.457502
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE100 63 9.77
2 HDPE PN6 PE100 75 1.023
3 HDPE PN6 PE100 90 1.503
4 HDPE PN6 PE100 110 0.848
5 HDPE PN6 PE100 140 0.34
6 HDPE PN6 PE100 160 0.621
HSC Connection
Sno. Total Nos.
1 498
Other Details
2.98
2.96
0.00
20-Oct-2024
25-Oct-2024