| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8389553 | Name of Scheme: CHHAYANSA GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3593 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 20-Mar-2024 | Actual Date of Completion (Capex): 30-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24M/90M | CHHAYNSA | 28.523681, | 77.676819 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERCIBLE | 750LPM/51M | CHHAYNSA | 28.523681 | 77.676819 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175KL/14M | CHHAYNSA | 28.523681 | 77.676819 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 12 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.508 | |
| 2 | HDPE | 90 | 1.342 | |
| 3 | HDPE | 110 | 0.260 | |
| 4 | HDPE | 140 | 0.107 | |
| 5 | HDPE | 160 | 0.172 | |
| 6 | HDPE | 200 | 0.320 | |
| 7 | HDPE | 75 | 1.457 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 621 |