| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8389573 | Name of Scheme: MANGROLI GRAM PANCHAYAT WATER SUPPLY | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2939 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 20-Mar-2023 | Actual Date of Completion (Capex): 31-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24/94 | MANGROLI | 28.620038 | 77.592487 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 450/53 | MANGROLI | 28.620038 | 77.592487 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/12 | MANGROLI | 28.620038 | 77.592487 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 250 | 0.019 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.175 | |
| 2 | HDPE | 75 | 0.910 | |
| 3 | HDPE | 90 | 0.341 | |
| 4 | HDPE | 110 | 0.068 | |
| 5 | HDPE | 125 | 0.101 | |
| 6 | HDPE | 140 | 0.070 | |
| 7 | HDPE | 180 | 0.338 | |
| 8 | HDPE | 200 | 1.310 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 487 |