Project Completion Certificate (Ground Water)
Scheme ID: 8389907 Name of Scheme: KARRIYA NAWADA VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1330 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Apr-2023 Actual Date of Completion (Capex): 23-May-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell Work 16.08/85.1 Karriya Nawada 28°37'45.7"N 79°38'25.1"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 5 HP 0.30/36 Karriya Nawada 28°37'45.7"N 79°38'25.1"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank (Conventional) 100/12 28°37'46.5"N 28°37'46.5"N 79°38'25.2"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Rising main K-7 100 0.037
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 1.812
2 HDPE Pipe 75 .100
3 HDPE Pipe 90 .123
4 HDPE Pipe 110 .123
HSC Connection
Sno. Total Nos.
1 209
Other Details
156.20
156.20
155.20
01-Sep-2023
01-Sep-2023