| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8389908 | Name of Scheme: SAIJNA MUSTQIL VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1811 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 11-Apr-2023 | Actual Date of Completion (Capex): 24-Apr-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell Work | 18.09/77 | Saijna Mustqil | 28°35'19.5"N | 79°45'53.8"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump 7.5 HP | 0.35/36 | Saijna Mustqil | 28°35'19.5"N | 79°45'53.8"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank (Conventional) | 150/12 | Saijna Mustqil | 28°35'19.8"N | 79°45'54.0"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Rising main K-7 | 100 | .037 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe | 63 | 4.503 | |
| 2 | HDPE Pipe | 75 | .065 | |
| 3 | HDPE Pipe | 90 | .120 | |
| 4 | HDPE Pipe | 110 | .096 | |
| 5 | HDPE Pipe | 125 | .156 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 363 |