Project Completion Certificate (Ground Water)
Scheme ID: 8389917 Name of Scheme: SAFAURA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1840 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Apr-2023 Actual Date of Completion (Capex): 23-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell Work 12.03/88.06 Safaura 28°14'41.1"N 79°48'17.0"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 7.5 HP .39/34 Safaura 28°14'41.1"N 79°48'17.0"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank (Conventional) 150/10 Safaura 28°14'41.5"N 79°48'16.5"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Rising main K-7 125 .036
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 3.041
2 HDPE Pipe 75 .153
3 HDPE Pipe 90 .136
4 HDPE Pipe 125 .137
5 HDPE Pipe 140 0.074
HSC Connection
Sno. Total Nos.
1 344
Other Details
178.47
178.47
177.47
02-Mar-2024
02-Mar-2024