| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 8010037 | Name of Scheme: Kuraicha GOV | No. of Villages: 74 | No. of Habitation Covered: 74 |
| Total Population Covered: 164050 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-Jun-2022 | Actual Date of Completion (Capex): 30-Sep-2024 | ||
| Intake | |||||
|---|---|---|---|---|---|
| Dia./Height (In Mtr.) | Capacity (In MLD) | Location | Latitude | Longitude | |
| 8.5/17.5 | 27.47 | Saprar Dam | 25°1234.38 N | 79° 551.78 E | |
| WTP | |||||
|---|---|---|---|---|---|
| Capacity (In MLD) | Location | Latitude | Longitude | ||
| 25 | Kuraicha | 25°135.64 N | 79° 629.25 E | ||
| CWR's | |||||
|---|---|---|---|---|---|
| Sno. | Str. | Capacity (In KL) | Location | Latitude | Longitude |
| 1 | WTP CWR | 2600 | Kuraicha | 25°13'5.64"N | 79° 6'29.25"E |
| 2 | CWR-1 | 250 | Kuwan | 25°10'57.04"N | 79° 6'39.26"E |
| 3 | CWR-2 | 1450 | Bamhaurisuhagi | 25°14'37.79"N | 79° 1'20.93"E |
| 4 | CWR-3 | 400 | Laron | 25°13'55.83"N | 78°56'49.31"E |
| 5 | CWR-4 | 1100 | Magarwara | 25°18'1.36"N | 78°59'43.65"E |
| 6 | CWR-5 | 1100 | Bangra | 25°19'13.42"N | 79° 0'34.34"E |
| 7 | CWR-6 | 450 | Ghurat | 25°19'5.70"N | 78°58'6.97"E |
| 8 | CWR-7 | 400 | Luhari | 25°21'18.38"N | 78°54'16.48"E |
| 9 | CWR-8 | 150 | Gairaha | 25°20'40.56"N | 79° 0'19.76"E |
| 10 | CWR-9 | 400 | Uldan | 25°23'29.20"N | 79° 0'53.41"E |
| 11 | CWR-10 | 250 | Bijaigarh | 25°26'26.21"N | 79° 0'11.93"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Vertical Turbine | 299.40 / 20.00 | Intake | 25°12'34.38"N | 79° 5'51.78"E |
| 2 | Vertical Turbine | 243.00 / 20.00 | WTP | 25°13'5.64"N | 79° 6'29.25"E |
| 3 | Vertical Turbine | 79.20 / 40.00 | WTP | 25°13'5.64"N | 79° 6'29.25"E |
| 4 | Vertical Turbine | 52.20 / 17.00 | Kuwan | 25°10'57.04"N | 79° 6'39.26"E |
| 5 | Vertical Turbine | 27.60 / 35.00 | Kuwan | 25°10'57.04"N | 79° 6'39.26"E |
| 6 | Vertical Turbine | 140.40 / 85.00 | Bamhauri Suhagi | 25°14'37.79"N | 79° 1'20.93"E |
| 7 | Vertical Turbine | 258.60 / 48.00 | Bamhauri Suhagi | 25°14'37.79"N | 79° 1'20.93"E |
| 8 | Vertical Turbine | 72.00 / 79.00 | Bamhauri Suhagi | 25°14'37.79"N | 79° 1'20.93"E |
| 9 | Vertical Turbine | 78.60 /27.00 | Laron | 25°13'55.83"N | 78°56'49.31"E |
| 10 | Vertical Turbine | 62.40 / 73.00 | Laron | 25°13'55.83"N | 78°56'49.31"E |
| 11 | Vertical Turbine | 186.80 / 40.00 | Magarwara | 25°18'1.36"N | 78°59'43.65"E |
| 12 | Vertical Turbine | 67.80 / 62.00 | Magarwara | 25°18'1.36"N | 78°59'43.65"E |
| 13 | Vertical Turbine | 78.00 / 105.00 | Magarwara | 25°18'1.36"N | 78°59'43.65"E |
| 14 | Vertical Turbine | 96.60 / 37.00 | Bangara Dhawa | 25°19'13.42"N | 79° 0'34.34"E |
| 15 | Vertical Turbine | 144.00 / 16.00 | Ghurat | 25°19'5.70"N | 78°58'6.97"E |
| 16 | Vertical Turbine | 49.80 / 19.00 | Ghurat | 25°19'5.70"N | 78°58'6.97"E |
| 17 | Vertical Turbine | 49.80 / 25.00 | Luhari | 25°21'18.38"N | 78°54'16.48"E |
| 18 | Vertical Turbine | 94.20 / 121.00 | Luhari | 25°21'18.38"N | 78°54'16.48"E |
| 19 | Vertical Turbine | 34.20 / 28.00 | Gairaha | 25°20'40.56"N | 79° 0'19.76"E |
| 20 | Vertical Turbine | 98.40 / 52.00 | Uldan | 25°23'29.20"N | 79° 0'53.41"E |
| 21 | Vertical Turbine | 40.80 / 46.20 | Uldan | 25°23'29.20"N | 79° 0'53.41"E |
| 22 | Vertical Turbine | 54.00 / 60.00 | Bijaigarh | 25°26'26.21"N | 79° 0'11.93"E |
| 23 | Vertical Turbine | 45.00 / 20.00 | Bijaigarh | 25°26'26.21"N | 79° 0'11.93"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 400KL-18m | Hati | 25°26'41.00"N | 78°55'24.00"E |
| 2 | OHT-2 | 325KL-14m | Bijaigarh | 25°26'26.21"N | 79° 0'11.93"E |
| 3 | OHT-3 | 300KL-12m | Barurframpur | 25°22'45.00"N | 79° 3'20.12"E |
| 4 | OHT-4 | 300KL-18m | Gairaha | 25°20'40.56"N | 79° 0'19.76"E |
| 5 | OHT-5 | 400KL-18m | Sewara | 25°17'50.03"N | 79° 0'10.74"E |
| 6 | OHT-6 | 350KL-12m | Ghurat | 25°19'5.70"N | 78°58'6.97"E |
| 7 | OHT-7 | 550KL-18m | Magarwara | 25°18'1.36"N | 78°59'43.65"E |
| 8 | OHT-8 | 350KL-18m | Luhari | 25°21'18.38"N | 78°54'16.48"E |
| 9 | OHT-9 | 700KL-12m | Khishinibuzurg | 25°16'39.67"N | 78°50'2.09"E |
| 10 | OHT-10 | 600KL-18m | Laron | 25°13'55.83"N | 78°56'49.31"E |
| 11 | OHT-11 | 450KL-18m | Katera | 25°13'52.46"N | 78°54'41.24"E |
| 12 | OHT-12 | 500KL-18m | Basari | 25°12'24.23"N | 79° 3'0.81"E |
| 13 | OHT-13 | 400KL-12m | Kuwan | 25°10'57.04"N | 79° 6'39.26"E |
| 14 | OHT-14 | 200KL-12m | Bonda | 25°'3.00"N | 79° 2'57.00"E |
| Raw Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | |
| 1 | Ductile Iron / K-9 | 600 | 1.700 | |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Ductile Iron / K-9 | 150 | 15.730 | |
| 2 | Ductile Iron / K-9 | 200 | 72.710 | |
| 3 | Ductile Iron / K-9 | 250 | 22.345 | |
| 4 | Ductile Iron / K-9 | 300 | 7.563 | |
| 5 | Ductile Iron / K-9 | 400 | 7.862 | |
| 6 | Ductile Iron / K-9 | 450 | 9.154 | |
| 7 | Ductile Iron / K-9 | 600 | 19.763 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | GI Pipe / Medium Duty | 50 | 208.270 | |
| 2 | GI Pipe / Medium Duty | 65 | 21.557 | |
| 3 | GI Pipe / Medium Duty | 80 | 18.615 | |
| 4 | HDPE Pipe PN 08, PE 100 | 63 | 140.975 | |
| 5 | HDPE Pipe PN 08, PE 100 | 75 | 41.578 | |
| 6 | HDPE Pipe PN 08, PE 100 | 90 | 12.499 | |
| 7 | HDPE Pipe PN 08, PE 100 | 110 | 20.125 | |
| 8 | HDPE Pipe PN 08, PE 100 | 125 | 11.124 | |
| 9 | HDPE Pipe PN 08, PE 100 | 140 | 11.217 | |
| 10 | HDPE Pipe PN 08, PE 100 | 160 | 13.107 | |
| 11 | HDPE Pipe PN 08, PE 100 | 180 | 8.087 | |
| 12 | HDPE Pipe PN 08, PE 100 | 200 | 7.476 | |
| 13 | Ductile Iron / K-7 | 100 | 42.505 | |
| 14 | Ductile Iron / K-7 | 150 | 52.739 | |
| 15 | Ductile Iron / K-7 | 200 | 34.471 | |
| 16 | Ductile Iron / K-7 | 250 | 39.118 | |
| 17 | Ductile Iron / K-7 | 300 | 9.507 | |
| 18 | Ductile Iron / K-7 | 350 | 11.4 | |